Medical and dental office build-outs in NYC
Doctors’ offices, dental practices, therapy and wellness suites built out or renovated across Manhattan and New York City, to your practice’s plans.
5.0 from 28 Google reviewsIn short
A medical or dental office build-out in New York combines a tenant improvement with healthcare details: accessible entrances and restrooms, plumbing in exam rooms and operatories, cleanable finishes, sound privacy and, where imaging is used, shielding specified by a qualified expert. MCG Corp builds from your architect’s and equipment vendor’s drawings and coordinates the specialist trades.
Medical office build-out with MCG Corp
Medical suites pack more plumbing, power and detail into each room than an office. Exam rooms need sinks, dental operatories need water, vacuum and air lines for the chairs, and every surface has to be easy to clean.
We coordinate with your architect, your equipment vendor and the building, and we schedule the work so the space is ready for equipment installation and any inspections before your opening date.
What this covers
- Medical office and clinic build-outs
- Dental office and operatory build-outs
- Exam rooms, sinks and plumbing
- Accessible entrances, corridors and restrooms
- Sound-insulated walls for privacy
- Cleanable floors, walls and ceilings
What New York adds to the job
Accessibility
Medical offices serve the public, so entrances, corridors and restrooms are built to accessibility code.
Specialist systems
Dental vacuum, compressed air and any medical gas are installed by qualified specialists to the vendor’s layout.
Imaging rooms
Rooms with X-ray equipment get shielding specified by a qualified expert; we build the walls to that specification.
What decides the cost of medical office build-out in New York
Every job is priced from an itemized written estimate after a site visit. These are the things that move the number most.
Number of rooms with plumbing
Every exam room or operatory with water adds plumbing work.
Equipment
Chairs, imaging and sterilization equipment set the power, plumbing and support needed.
Shell or second generation
A former medical suite can reuse plumbing and layout.
Finishes and privacy
Cleanable surfaces and sound-insulated walls cost more than standard office finishes.
How a project runs
Walkthrough and estimate
Billy visits, measures and asks what you want the space to do. You receive an itemized written estimate, not a ballpark.
Approvals and planning
Board package, landlord consent and any DOB filing are prepared and submitted. Materials with long lead times are ordered.
Construction
Work runs inside your building’s hours with common areas protected and the site cleaned daily. You get updates without having to chase them.
Inspections and walkthrough
Required inspections are passed, the punch list is closed with you, and the building receives its close-out paperwork.
What clients wrote on Google
5.0 from 28 Google reviewsBilly did a phenomenal job on my gym. We had a structural issue where the foundational joists were cracked and needed to be replaced. Billy and his amazing team got everything done within a quick time span, exceeding all expectations. Now my gym is up and running.
Billy and his team did excellent work. They kept us apprised of how the work was going and asked questions of us regularly. Reasonable price. I would strongly recommend them and will be using them again if further projects arise.
Billy and team are absolutely incredible. They helped us transform our apartment from something generic into something spectacular, assembling an all-star team for electrical work, stonework, painting, and tiling. They dealt diligently and patiently with our stringent condo board and all the paperwork required.
Medical office build-out questions
Do you build dental offices?
Yes. We build dental practices to the equipment vendor’s layout, including the plumbing, power and support for each operatory, with specialists for vacuum and air lines.
Can a regular office be converted to a medical office?
Often, but it is a change of use. It can need new plumbing, accessible restrooms and filings, so it is worth checking before you sign the lease.
How long does a medical office build-out take?
Design, landlord approval and permits come first. Construction runs from a few weeks for a renovation to a few months from shell, plus time for equipment installation.
Get a free medical office build-out estimate
Tell us about the space and what you want from it. Billy will come and see it, measure, and send an itemized written estimate.
- No charge for the visit or the estimate
- Itemized, in writing
- 10-year labor warranty
Or call (917) 445-7155